Control Center System
 |
The Control Center System is used with some of our impact and
penetration machines. It allows you to collect the results of the tests made by
the machines and transfer the data to a computer.
|
|
|
-
Lights when the control center system is on.
-
Lights when a connection to a computer is detected.
-
Lights when something passes through the
velocimiter (Time Gate).
-
This dial is used to set teh impact test:
-
(5) Uniaxial Z (Load Cell)
-
(6) Triaxial Z (Z Only)
-
(7) Triaxial X, Y, Z
-
When an
uniaxial accelerometer is plugged to the control center system and the
dial is set to Uniaxial Z, Ch.Z (10) will light.
-
When an
triaxial accelerometer is plugged to the control center system and the
dial is set to Triaxial Z Only , Ch.Z (10) will light.
-
When an
triaxial accelerometer is plugged to the control center system and the
dial is set to Triaxial X, Y, Z , Ch.X(8), Ch.Y(9) and Ch.Z(10) will all light.
|
|
|
-
If there is a velocimiter (Time Gate) on your impact tower it plugs into the
control center system at the place indicated by the number (11).
-
This is the place where the Acquisition card plugs into the control center
system.
-
The Control Box plugs in here.
-
For a Uniaxial test, a cable is attached to the accelerometer and to the plug
(15).
-
For a Triaxial Z-Only or X,Y,Z test, a cable is attached to the accelerometer
and to the plug (16).
-
For a Triaxial X,Y,Z test, a cable is attached to the accelerometer and to the
plug (16),(17) and (18).
-
For a Triaxial X,Y,Z test , a cable is attached to the accelerometer and to the
plug (16),(17) and(18).
-
The LVDT plugs into this socket.
-
This is the breaker.
-
The power corde attaches here.
|
 Acquisition card to be connected into computer's PCI port. |
|